Zoro Saftey Incidents

About The Project

The scope of this environmental project included the construction of two (2) LLDPE-lined Soil Treatment Facilities at Bullmoose Mine, bringing the decommissioned mine into compliance with the BC Mines Act.

In successful completion of this project with a zero-incident safety record, we provided the excavating, hauling, and placing of the two (2) Soil Treatment Facilities’ 120,000 tons of Hydrocarbon impacted soils, conducting UAV Drone Surveys to document and monitor the excavation of 53 identified areas of environmental concern. In addition, we completed the capping and covering of each Soil Treatment Facility, and the clearing and grubbing of a causeway located around sensitive wildlife habitat.

SECTOR:Environmental, Structural,
VALUE:$ 1,920,000.00
COMPLETION:October 2017
Key Features:
  • 53 areas of Environmental Concern
  • 120,000 Tons of Hydrocarbons
  • Remote location
  • 38,000 square metres of LLDPE liners
  • Valued Engineering Proposal to reduce costs
  • Zero safety incidents

Responsibilities

  • Prime Contractor
  • UAV Drone Survey
  • Two (2) Soil Treatment Facilities
  • AEC Excavations
  • LLDPE Liner Installation
  • Design and covering of two (2) Soil Treatment Facilities
  • Mines Act regulations