About The Project

The scope of this environmental construction project included the removal and replacement of three (3) failed culverts, each under warranty by the bonding company. Enviro-Ex was selected to complete this challenging project due to our extensive experience in the region, in addition to our prior knowledge of the project and all required Ministry specifications.
(Note: The failure of the culverts was due to an underlying peat layer beneath the installed culverts, which were no fault of the previous contractor)

SECTOR:Environmental, Heavy Civil, Structural,
VALUE:$ 825,000.00
COMPLETION:November 2016
Key Features:
  • One (1) culvert was 12m below grade
  • All three (3) culverts were in environmentally sensitive areas
  • Winter construction was required
  • 2100mm diameter culvert
  • Underlying peat
  • Zero safety incidents

Responsibilities

  • Prime Contractor
  • Excavation
  • Traffic Control
  • Quality Management
  • Environmental Protection